All the work carried out on turbochargers is completed by our OEM Trained Bartech Engineers, creating every confidence in the standards of work produced.
Our engineers are available world wide 24 hours a day, 7 days a week.
Our rapid response times are made possible by the ‘around the clock’ contact we offer with our Technical, Operations and Commercial departments.
For Overhaul, Dismantle & Inspection periods click here.
Our standard overhaul of turbochargers include: complete dismantle, chemical clean, inspection/measurement, re-balancing (if necessary), painting and testing.
All our tests are complete with our In-House Reports and to Lloyds Classification if required.
We also offer overhaul kits at competitive prices.
We supply both new and reconditioned complete turbocharger assemblies.
Complete Turbochargers are supplied with a 12 month Bartech Warranty.
We have a large stock of spare parts for turbocharger equipment, which also allows us to provide high-quality Overhaul Kits with a quick turnaround.
We source all our turbocharger spares from OEM suppliers or better.
Some of the spares we have available include: Rotor Assemblies, Compressor Wheels, Nozzle Rings, Shroud Rings (and kits), plus many more.
Holset – 3”, 4”, 4HD, 4LD, 6”, 6D, 6LD, 6U, HX Series
Garrett: Most Models
“Thanks for the help, and the fact that you were able to keep your promises regarding delivery time etc.
“Rob and his team at Bartech have time and time again assisted our company even when we ask for unrealistic timescales and results. They have identified and quoted for spares at each enquiry without fail.
This simple and quick response makes acquiring the right spares, right quality first time possible and allows us to return important plant back into service quicker than anticipated.
Look forward to working together in the coming years.”
“We have a long term service agreement with Bartech so putting together the work scope was made easy as we have worked with them in the past and know how they work in a professional matter.
All the organisation and spares were taken care of by the project engineer, once this was ready Bartech and CNR had a conference call with the platform to discuss the scope and iron out any issues that may arise during the scope and controls were put in place to prevent issues arising.”
“Bartech helped maintain & achieve our recovery plan in a safe manner & also implementing the improvements required to prevent similar incidents.
They were very adaptable to our urgent requirements and used all of their resources possible to expedite the safe return of P-7230 fire water pump.
Bartech exceeded our expectations during this intervention.”
“Please pass on my thanks to your team for the fantastic effort in getting this rearranged visit complete.
We had constraints on labour and lead time of equipment however all went seamlessly.
Please also pass this on to Matt and William and thank them for their workmanship whilst offshore, very much appreciated by all here at Fairfield.”
“When a fault was found with the water cooler adaptor plate, a new part was sourced and sent out to the platform the following day. This meant the crane could be returned to service as planned and therefore no downtime experienced.”
“The technical knowledge and speed of sourcing the required part. The platform also commented positively on the work ethic of the engineer on the job.”
If you’re after a trustworthy engine specialist with an excellent track record for your job then let's get started
Get support now 01206 673101 24hDealers For:
A collection of articles to help you improve engine reliability, performance and safety specifically for engineers, brought to you by Bartech Marine. Simply enter your email below to get instant access.
By completing this form you are agreeing to our privacy policy.