Twin Disc Gear Box Overhauls

Read more on how we helped this client below and discover how we can help you too...

Background

We were sent in two Twin Disc MG-5075 A gearboxes from a Volvo TAMD75 EDC from Boatyard on behalf of a vessel owner which had seized and filled with seawater after the stern of the vessel had become submerged.

The gear boxes were partially stripped by the boatyard before contacting Bartech.

Solution

We completed the overhaul of the gearboxes to bring them back to new specification.

Twin Disc MG-5075 overhaul

Outcome

The gearboxes arrived in our workshop on a Wednesday and we followed our normal overhaul process, including dismantle, clean, inspect, report and rebuild. The overhaul included replacement of all bearings and full inspection of all gears.

On completion, the gearboxes were fitted and commissioned by our service engineers on Saturday morning.

Got a problem like this that you need help with? See how we can help!

Find out more

Proud to be supporting:

https://bartechmarine.com/wp-content/uploads/MAN-logo-1.png https://bartechmarine.com/wp-content/uploads/bp-big@2x.png https://bartechmarine.com/wp-content/uploads/maersk-logo@2x.png https://bartechmarine.com/wp-content/uploads/edf-logo@2x.png https://bartechmarine.com/wp-content/uploads/RR-mtu_Logo_Lockup-solution_Positive_sRGB-scaled-e1669032340714.jpg https://bartechmarine.com/wp-content/uploads/shell-logo@2x.png https://bartechmarine.com/wp-content/uploads/connoco-logo@2x.png

Engineer Resource Vol. 2 is now out for FREE download. Get your copy now!

A collection of articles to help you improve engine reliability, performance and safety specifically for engineers, brought to you by Bartech Marine. Simply enter your email below to get instant access.

  • This field is for validation purposes and should be left unchanged.

By completing this form you are agreeing to our privacy policy.

Freeguide
free engineer resource guide
Top