    Reduce mechanical failures and expensive downtime – trust Bartech
  • 1.  Peace of MindAll parts supplied, and work completed is covered by our full 12 month Warranty.
  • 2.  Skilled TeamA team with over 300 years combined experience in engineering, including OEM apprenticeships and training.
  • 3.  Proven ExperienceWe are proud to have worked with MAN, Shell, Lockheed, British Energy, & Tanzanian Railways, and our spares have been fitted on vessels for the American Navy Indonesian Navy, Indian Navy and Royal Fleet Auxiliary.
  • 4. Extensive StockWe hold comprehensive stocks consisting of over 3000 different items. All items are easily identified & detailed on our bespoke computerised system.
  • 5.  Engineering ExpertiseOur team have the ability to take on all mechanical projects, so therefore no challenge is too great.
  • 6.  Customer SupportYou can depend on us for complete service contracts, or individual projects. Our engineers have travelled the world supporting our customers, including Africa, Middle East, Far East, Europe and the Americas.
  • 7.  Excellent FacilitiesPurpose built head office, which includes a fully equipped workshop, dedicated governor bay, test facilities and machine shop including state of the art CNC machines. You are always welcome to see us working on your projects.

Engineering Projects Case Study


Overhaul of Schotell Steering Unit for Dredger



Challenge:


Propeller on the steering unit was caught on the sea bed, damaging the propeller and causing the internal bearing to break-up which passed debris through the gears, making them unusable.  The dredger was no longer able to continue it's contract until the steering unit was repaired

How we helped:

 

  • Completely dismantled, cleaned and inspected the assembly.
  • Full report issued to the vessel owners with photographs
  • To overcome the OEM's delivery time for the replacement bevel gears we were able to have these manufactured by a trusted gear cutting company within 5 working days.
  • The unit was rebuilt using new consumable parts.
  • Repaired propeller and securely fitted it to the assembly.
  • Painted all exposed metal surfaces with additional environmentally safe anti-fouling paint.
  • Despatched unit and fitted it to the vessel while in dock.

 

Results:


Dredger operational again within 10 working days.  Due to the importance of this item, and the regularity of the propeller hitting the sea bed, a spare has been purchased which we store and exchange as required ensuring downtime is kept to a minimum.