How did working with Bartech benefit you / your company on this project?
“Restored availability of our emergency generation package in support of meeting our first oil date.
Bartech were able to support Solan’s corrective maintenance requirements on our Turner packaged MTU diesel generator set, when Turner EPS could not, due to both material and competency issues.
Our experience of working with Bartech was rewarding and we will certainly look to do business with them again.”
Mike Oliver ~ Premier Oil
“Bartech helped maintain & achieve our recovery plan in a safe manner & also implementing the improvements required to prevent similar incidents.
They were very adaptable to our urgent requirements and used all of their resources possible to expedite the safe return of P-7230 fire water pump.
Bartech exceeded our expectations during this intervention.”
TAQA Bratani
“Bartech’s work ethic permeates through the organization, from Rob Lee the Bartech Project & Commercial Manager through to the technicians overhauling, testing, installing and commissioning the engines.
The communication is exactly what we expect from a supplier of products and services delivered to us here at Hartlepool PowerStation from weekly updates to overhaul documentation showing exactly where they are in the sequence of work.
It is excellent to see and sets a standard most do not achieve.”
Daniel Lanna ~ EDF Hartlepool
“Thank you.
The site report and the overhaul at site have been conducted to a high standard.
Well done.”
Wood Group Asset Management Solutions
“Please pass on my thanks to your team for the fantastic effort in getting this rearranged visit complete.
We had constraints on labour and lead time of equipment however all went seamlessly.
Please also pass this on to Matt and William and thank them for their workmanship whilst offshore, very much appreciated by all here at Fairfield.”
Martin Baxter ~ Fairfield Energy
“We have a long term service agreement with Bartech so putting together the work scope was made easy as we have worked with them in the past and know how they work in a professional matter.
All the organisation and spares were taken care of by the project engineer, once this was ready Bartech and CNR had a conference call with the platform to discuss the scope and iron out any issues that may arise during the scope and controls were put in place to prevent issues arising.”
Alan Farquhar ~ CNR Ninian Central Platform